Home photovoltaic system of 5KW is suitable for houses and households that have an average monthly electricity consumption of up to 600kw 700kw.
Price for the project depending on the components from BGN 9,000 to BGN 15,000. Installation is not included in the price.
The efficiency of this solar system can be improved with the Huawei power supply module and Huawei 5KW battery, which will store the produced energy and will allow you to use it at your desired time of the day. Your photovoltaic system can be supplemented with a sensor that detects the electricity produced and a dongle for connection to Huawei's monitoring software.
Required elements: Solar panels 10 pcs of 540KW 5KW inverter Single-phase junction box Sensor for reading the produced energy Dongle for system monitoring More options: Battery management power supply module Battery Installation of commissioning
As initial data and for preparation of the realization of investment intention for construction of Photovoltaic power plant, we need the following information: Current sketch of the property; GPS coordinates or markings in Google Earth Hourly loading schedule for the twelve-month previous period (when available, otherwise for the purposes of the analysis of the invoices for consumed electricity for the last twelve months) Information on the number of connection / measurement points; Connected capacity under contract with ERP for the site; Plan roofs with detail and sections of the Architectural part; Electrical project (if available); Design Visa and Accession Opinion (if available). Please specify whether you envisage the system to be for own use only or whether you will return the surplus to the ERP network. The first steps you need to take in order to obtain source documents are to apply for a Design Visa and an Accession Opinion.
As initial data and for preparation of the realization of investment intention for construction of Photovoltaic power plant, we need the following information: Current sketch of the property; GPS coordinates or markings in Google Earth Hourly loading schedule for the twelve-month previous period (when available, otherwise for the purposes of the analysis of the invoices for consumed electricity for the last twelve months) Information on the number of connection / measurement points; Connected capacity under contract with ERP for the site; Plan roofs with detail and sections of the Architectural part; Electrical project (if available); Design Visa and Accession Opinion (if available). Please specify whether you envisage the system to be for own use only or whether you will return the surplus to the ERP network. The first steps you need to take in order to obtain source documents are to apply for a Design Visa and an Accession Opinion. Required elements: Solar panels 10 pcs of 540KW 5KW inverter Single-phase junction box Sensor for reading the produced energy Dongle for system monitoring More options: Battery management power supply module Battery Installation of commissioning